Airport Pavement Renewal

C2 Contracting Limited is proud to be supporting BPC as a key subcontractor on the Auckland Airport Pavement Renewal Project. Engaged for our expertise in formwork and concrete works, we are contributing to the successful delivery of this critical infrastructure upgrade in a highly operational airside environment. Our team brings precision, reliability, and a strong safety focus to ensure high-quality outcomes that meet the demanding standards of one of New Zealand’s busiest transport hubs.

Explore Our Previous Work

Auckland Airport - Taxiway Mike/RSS2

As a workforce solutions provider, we were engaged by BPC to support the successful delivery of the Auckland Airport Taxiway Mike/RSS2 project. Our scope of work included foundation preparation, formwork, assisting steel fixers, concreting, precast panel installation, and carpentry services. Working within a live airside environment, our experienced crews met strict safety and compliance standards while delivering high-quality work on time and to specification. We’re proud to have contributed to a key piece of critical infrastructure alongside a trusted delivery partner like BPC.

Papakura Water Treatment Plant

C2 Contracting Limited was engaged by Brian Perry Civil to deliver key concrete and formwork works for the reinstatement of the Papakura Water Treatment Plant a critical infrastructure project under Watercare’s drought response programme.

Our work supported both Stage One and Stage Two of the project, including the construction of structural formwork, installation and tying of reinforcing steel, and placement and finishing of concrete for key elements such as clarifier bases, BAC filter structures, and retaining wall foundations. Precision and coordination were essential, particularly given the tight site constraints, minimal laydown space, and complex sequencing with other trades on site.

Working within an active civil and mechanical environment, our team consistently delivered to a high standard, ensuring compliance with strict engineering specifications, safety protocols, and timelines. We’re proud to have contributed to a project that now plays a vital role in strengthening Auckland’s water supply resilience.

WAIKATO 50

As part of the urgent Waikato 50 project, C2 Contracting Limited was engaged by Brian Perry Civil to deliver a range of structural and carpentry services that supported the rapid expansion of Auckland’s water supply network.

Our team was responsible for installing precast concrete panels, constructing foundations and formwork, assisting with steel-fixing, and completing various carpentry tasks across the site. Working within a compressed programme and highly coordinated environment, we maintained a strong focus on precision, safety, and adaptability to meet the project’s demanding pace.

Delivered in just over 12 months, Waikato 50 stands as a showcase of accelerated infrastructure delivery. C2 Contracting is proud to have played a hands-on role in a nationally significant project that has strengthened Auckland’s long-term water resilience.

Whenuapai Apron Upgrade

C2 Contracting Limited is proud to support Brian Perry Civil in the delivery of critical infrastructure upgrades at Whenuapai Airbase for the New Zealand Defence Force. Our team has been involved in key construction activities as part of the replacement of over 16,500m² of airfield hardstand and taxiways.

Our scope includes formwork construction, concrete placement, supporting earthworks, and general carpentry and structural works to help ensure the successful delivery of new pavement infrastructure. We also contributed to the on-site processing and handling of crushed concrete, promoting sustainability and efficiency on this high-security, live operational site. 

Working alongside BPC since project mobilisation in September 2023, our crew has remained committed to maintaining high safety standards and collaborative site practices, contributing to a project that is not only ahead of schedule but also injury-free. We’re proud to play a part in delivering durable and high-performance infrastructure for the NZDF.

Wolverton Street Culverts Replacement

C2 Contracting Limited worked alongside Brian Perry Civil to support the delivery of the Wolverton Culverts Replacement Project, a complex infrastructure upgrade for Auckland Transport, designed to improve stormwater resilience and safeguard a vital arterial route in West Auckland.

Our team contributed to the formwork and concrete construction for two large-span culvert structures, as well as foundation preparation, pile cap support works, and general civil tasks across the site. Operating in a highly congested urban environment with live traffic and significant underground services, our work required precision, flexibility, and close coordination with multiple stakeholders and contractors.

The project involved installing over 200 bored piles, realigning major road sections, and protecting critical utilities such as the Huia 2 watermain and IP20 gas main. Through disciplined execution and adherence to safety and quality standards, C2 Contracting played a key role in delivering a durable, future-proofed stormwater and transport solution for West Auckland.