McConnell Dowell - OUR INVOLVEMENT
Civil Construction. High-Quality Concrete Pavements. Efficient Formworks. And more.
Explore Our Work
Auckland International Airport - Eastern Airfield Buildings Relocation
C2 Contracting played a specialist role in the Eastern Airfields Building Relocation project with McConnell Dowell. A complex package of works was delivered within a live airside environment. Our scope included formwork and concrete construction for multiple facilities and infrastructure elements, including:
- A new walkway and canopy connecting the domestic and international terminals
- Airside security checkpoint foundations and access road works
- Transitional waste and effluent waste facilities
- Structural work for the new MPI livestock inspection shed
- Underground service trenches, utility diversions, and general pavement works
- Fencing, footpaths, gates, and road furniture
This award-nominated project was a finalist in the 2023 CCNZ Hirepool Construction Excellence Awards (Category 4 – $20M to $100M), and C2 Contracting is proud to have contributed to its successful delivery.
Auckland International Airport - Fuel Network Upgrades
C2 Contracting Limited was engaged by McConnell Dowell to carry out key civil and structural works as part of the multi-stage Fuel Diversion Project at Auckland Airport — a critical enabling package to support the development of the new domestic jet terminal.
Our team supported the re-routing of 600 metres of DN450 buried steel fuel pipeline, which required extensive civil works in a live airside environment. Our scope included:
- Excavation and backfilling for pipeline and valve infrastructure
- Concrete removal and reinstatement, including aprons and pavements
- Structural support for new fuel hydrant pit installations and valve connections
- Formwork and concrete construction for Pit 5 and other key fuel infrastructure
- Support for complex pipe lifts, working in tightly controlled operational zones
- Lighting upgrades, line marking, and general surface reinstatement
Working within a high-risk environment, C2 Contracting delivered safely and efficiently under strict aviation compliance and security protocols. We’re proud to have contributed to this essential infrastructure, enabling the airport’s long-term terminal expansion while maintaining uninterrupted fuel operations.