SPEARGRASS PROJECTS - TAWERA GROUP
Civil Construction. Modular Buildings. Efficient Rondo Cladding Systems. And more.
Explore Our Work
Modular Buildings - Daventry
C2 Contracting Limited has delivered high-quality installation services for Rondo cladding systems as part of a series of modular construction building projects. Known for its strength, durability, and flexibility, the Rondo system is a preferred solution for non-structural wall and ceiling framing in modular and prefabricated construction.
Our scope has included:
- Precision installation of Rondo steel wall and ceiling framing systems
- Integration with modular building layouts to ensure alignment, durability, and performance
- Coordination with cladding and façade systems to meet thermal, acoustic, and fire performance requirements
- On-site modifications and adjustments to suit bespoke modular designs
Working within tight timelines and high-precision environments, our team ensures clean finishes and compliance with both manufacturer specifications and building code requirements. C2 Contracting continues to support modular construction clients by providing efficient, dependable cladding solutions tailored to the demands of prefabricated and transportable buildings.